Capability statement

Case study · Strata
Ducted system fault across multiple lots
A residential building had a ducted system affecting several lots, with disagreement between owners about responsibility for the repair.
Situation
A ducted system serving several lots had failed. Owners disagreed about whether the plant, the ductwork or the lot components were responsible, and the committee needed a defensible position before spending money.
What we did
- 1Attended and diagnosed the failure across plant, ductwork and lot components.
- 2Reported in plain terms what was common property and what was lot property.
- 3Set out options for each, with the likely outcome of repair versus replacement.
- 4Documented the recommendation for the committee to act on.
Result
Committee approved the correct scope first time, and the repair proceeded without repeat attendance or dispute over the cause.