A licensed venue called with a cool room climbing in temperature overnight, a full week of stock inside and service the next day.
Situation
The venue had a full week of stock in the cool room and a busy service the following day. Temperature was rising overnight with no-one on site, and the manager needed to know whether to move stock or wait for attendance.
What we did
- 1Attended as a priority and confirmed the room could be stabilised rather than emptied.
- 2Isolated the fault, made the system safe and brought the room back to temperature.
- 3Identified the failed component and set out a permanent repair with the part confirmed before booking.
- 4Completed the permanent repair on a planned visit rather than in emergency conditions.
Result
Stock retained, trading uninterrupted, and the repair completed at a planned rate instead of an after-hours emergency call-out.